16 trains behind schedule due to fog in Delhi, Delhi shivering at 6 degree

At least 16 trains were running behind schedule at the time of publishing this report, due to foggy conditions in capital city Delhi. Delhi recorded cold Monday with the minimum temperature at 6 degrees Celsius in early morning.

Delhi is observing cold since Sunday with the Met department predicting a cold start to the weekday. The forecast is also for light rains in Delhi and adjoining parts of Gurugram and Noida starting Tuesday. Foggy conditions too are expected to hamper rail and air traffic.

The weather has taken a chilly turn after several days of bright sunshine and comfortable temperatures. On Sunday, the minimum temperature recorded in Delhi was at 5.2 degrees Celsius which was four degrees below normal. Just a day earlier – on Saturday – the minimum was at 10 degrees Celsius. “Clear sky with strong surface winds during the day and cold wave conditions are likely to prevail at isolated pockets,” an official from the India Meteorological Department was quoted as saying by news agency.

GSTVના લેટેસ્ટ News અને Videos માટે લાઈક કરો Youtube Twitter